Unread 09-02-2009, 03:33 PM   #11
gsdave
engineer
 
gsdave's Avatar
 
Join Date: May 2008
Location: Marianna
Posts: 228
Name :
gsdave is on a distinguished road
Default

Quote:
Originally Posted by Rich Z View Post
The guy quoted me a price. I had to assume he was experienced in putting in pads for buildings of this nature and knew what he was doing. He actually showed up here this morning intending to get started, which tells me he was completely clueless about what he was doing if he was going to start digging and putting up the forms. I can't know that someone else doesn't know what they are doing. I'm having enough trouble trying to figure out what I need to know, much less someone else who is supposed to be a professional.
I'm just trying to help you out, Rich. Not trying to bust your balls. Just trying to show you how the contractor sees it from my 13+ years of experience as an engineer in commercial construction.

What you did was basically tell the guy you wanted a car. He priced up a basic car. Then when he arrived on site, you stipulated that it had to be a car, built like a tank, with x bells and whistles.

Contractors are NOT engineers, so expecting him to design a slab for your building to meet a certain code or sub soil condition that he is not aware of is a little unreasonable. I'm pretty sure he was expecting to pour a slab for a 'farm building' on good soil that would not be permitted, inspected, etc. but I could be wrong. Lots of buildings get built this way. You said that he was a professional and should know what he was doing. I'm sure he does know what he's doing if he has a good reputation and was recommended to you. There are lots of people in construction that will try to screw you over, but I really don't think this guy was trying to do so.

Basically what the permit information is saying is that you can do your own plumbing, carpentry, electrical, etc, but if you hire someone to do it and you're not going to supervise and take responsibility for their work, then they must be licensed.

I know that the permitting process is very frustrating to people that don't deal with it on a regular basis. But if anyone tells you the toughest part of a project is going to be obtaining a permit, you should look somewhere else.
gsdave is offline   Reply With Quote
Unread 09-02-2009, 04:03 PM   #12
Rich Z
Internet Sanitation Engineer
 
Rich Z's Avatar
 
Join Date: Mar 2006
Location: Crawfordville, FL
Posts: 15,127
Name : Rich Zuchowski
Rich Z will become famous soon enoughRich Z will become famous soon enough
Default

But I told him exactly what the building was going to be. I mentioned about there being clay involved, and I was waiting for foundations drawings after doing the soil borings. He knew it was a prefabricated steel building. He knew the dimensions. He knew pipe clay was involved.

*As an aside, the revised drawings did not have the drawings changed at all. Merely had text added on a page with some descriptions stating that the bore samples did not uncover anything that would impact the foundation design, as presented. Based on what I have seen, the foundation was already designed far above the minimum specs to deal with something like that.

My concern is that based on his reaction, he had no intention of building a foundation anywhere near as sturdy as the one called for in the plans. Perhaps he is not really a bad guy and just over ambitious and jumped the gun a bit. But still, had he gotten to digging out the footers and supports and gotten the forms in place, THEN the design had shown up, what then? For all I knew, the foundation design was standard and everyone did it that way. And based on his jumping right into it and accepting the verbal contract between us, I certainly thought that this was the case.

If there is anything actually bad about the whole thing, it's that I really don't know what he intended on doing without having anything at all to go on when the first spade of dirt would have come out of the ground. Bad? Perhaps not. Smart? Definitely NOT.

I am perfectly willing to supervise the work and take full responsibility for who I hire to do it. I don't have a problem with that. Obviously I don't know what the heck I am doing, but if all the steps along the way are inspected, and the people doing the work follow the plans to the letter and do work of a quality that will pass the permit required inspections as well as my own judgment of what I THINK should be done, then I don't have a problem with it. If I make a mistake in judgment that causes problems down the road, then that is my problem to have to deal with and I am quite willing to take that hit directly on the chin without shedding a tear over it.

Quote:
But if anyone tells you the toughest part of a project is going to be obtaining a permit, you should look somewhere else.
Maybe things are different in your area, but to a person, everyone HERE has said that the permit process IS and WILL BE the worst part by far of this whole process. Personally I'm hoping they are wrong, but something tells me that they will not be.
__________________
Rich Z is offline   Reply With Quote
Unread 09-02-2009, 06:03 PM   #13
gsdave
engineer
 
gsdave's Avatar
 
Join Date: May 2008
Location: Marianna
Posts: 228
Name :
gsdave is on a distinguished road
Default

Quote:
Originally Posted by Rich Z View Post
But I told him exactly what the building was going to be. I mentioned about there being clay involved, and I was waiting for foundations drawings after doing the soil borings. He knew it was a prefabricated steel building. He knew the dimensions. He knew pipe clay was involved.
Here is the problem with that. There are many more than one way to skin a cat. If you don't give him the drawings to begin with, he's going to price it doing it his way. In all honesty, he may have been able to talk to a structural engineer about doing it his way and the engineer may have said it would be fine.

Quote:
*As an aside, the revised drawings did not have the drawings changed at all. Merely had text added on a page with some descriptions stating that the bore samples did not uncover anything that would impact the foundation design, as presented. Based on what I have seen, the foundation was already designed far above the minimum specs to deal with something like that.
Well, maybe that means it was 'over designed' before they knew what the soil was like? This might sound good to you, but if it cost 50% more to do it that way and you didn't NEED to do it that way you might not be as happy.

Quote:
My concern is that based on his reaction, he had no intention of building a foundation anywhere near as sturdy as the one called for in the plans. Perhaps he is not really a bad guy and just over ambitious and jumped the gun a bit. But still, had he gotten to digging out the footers and supports and gotten the forms in place, THEN the design had shown up, what then? For all I knew, the foundation design was standard and everyone did it that way. And based on his jumping right into it and accepting the verbal contract between us, I certainly thought that this was the case.
As I eluded to above, his way may have exceeded the requirements but not have been the same way the engineer was calling for. Its not very likely, but its possible.

Honestly if he had started working and you brought plans to him after he had significant work in place and said "build it like this", you would have been liable for the work he would have to redo based on the new plans.

Quote:
If there is anything actually bad about the whole thing, it's that I really don't know what he intended on doing without having anything at all to go on when the first spade of dirt would have come out of the ground. Bad? Perhaps not. Smart? Definitely NOT.
This is a problem when people that don't normally do this type of thing (act as a general contractor) try to do it. They get quotes from contractors without clearly defining the scope of work. I would have asked him specifically what how he had originally planned to build the slab.

Quote:
Maybe things are different in your area, but to a person, everyone HERE has said that the permit process IS and WILL BE the worst part by far of this whole process. Personally I'm hoping they are wrong, but something tells me that they will not be.
My area has included literally millions of square feet of buildings from Louisianna to South FL and lots of different clients. I've heard people say the same thing, but its always people that don't normally deal with the permitting process. And I agree that it can be very annoying and difficult, just like dealing with any government entity. But the reality of it is that its just paperwork.

I would be glad to do anything I can to help you during this process. I have made plenty of mistakes along the way and like to think I learned a thing or two. The best advice I can give you is to use guys that are licensed and clearly define the scope of work to your subs before agreeing to a price.
gsdave is offline   Reply With Quote
Unread 09-02-2009, 07:56 PM   #14
Rich Z
Internet Sanitation Engineer
 
Rich Z's Avatar
 
Join Date: Mar 2006
Location: Crawfordville, FL
Posts: 15,127
Name : Rich Zuchowski
Rich Z will become famous soon enoughRich Z will become famous soon enough
Default

A friend of mine dropped by tonight who actually IS an engineer. He's been helping me along with all this stuff. Well he took a look at the foundation drawing and said it was pretty much what he would have expected the foundation to be like. Maybe a little heftier than normal, but nothing as extravagant as Mr. Smith was alluding to by the show he put on.

I also had a second guy stop by today to talk to me about doing the concrete work and I showed him the drawing. He, too, didn't see anything unusual in it and didn't blink an eye at all. He was supposed to call me back in a few hours (this was around 11:30am or so ) to give me a price, but apparently he found other things more pressing to do. Not that I got a good feeling about him. He says he hasn't done any concrete work for two years and has just been out fishing the entire time. I would guess he doesn't have a valid license any longer, either, and he stated that he felt he had probably had all his accounts with the concrete suppliers lapse by now. I didn't get a very warm and fuzzy from that one at all. But at least I got the feedback about the foundation that was helpful.

Nope. My opinion is that Mr. Smith decided to put on a show to try to squeeze more money out of me by making the appearance that the foundation was something very extraordinary and therefore much more expensive. Unfortunately for him, it failed, and he had to find something else to do with his time (and that of the crew he had there) today. Maybe he just felt he quoted too low of a price (total was $11,000 for the 30x50 slab, and the 20x50 apron in front) and needed to try to get more money. But he just picked the wrong way to approach me about that.

On another front, G&L Steel is apparently out for doing the erection (man I always feel FUNNY when I say or type that word...) for me. Connie specifically remembered the owner telling us while she was here that they were licensed and insured, but now it has come out that they actually do NOT have a license. So tomorrow I'm going to be contacting the permit office to see if I can get a list of licensed concrete and steel building erection people and go back to square one with getting price quotes.

Just been a piss poor day today for me rubbing elbows with out and out liars. And I thought all the two legged snakes were in the reptile business I work in.
__________________
Rich Z is offline   Reply With Quote
Unread 09-02-2009, 08:54 PM   #15
gsdave
engineer
 
gsdave's Avatar
 
Join Date: May 2008
Location: Marianna
Posts: 228
Name :
gsdave is on a distinguished road
Default

It sounds like Mr. Smith was more of a driveway and sidewalk type of concrete guy than a building slab guy. Good thing you found out sooner than later! I'd be interested in hearing what the slab prices are from guys that have the drawings.

Also glad to hear you have an engineer helping you with everything. Good luck with the build.
gsdave is offline   Reply With Quote
Unread 09-02-2009, 09:32 PM   #16
85vette
Senior Member
 
85vette's Avatar
 
Join Date: Mar 2007
Location: On the road
Posts: 2,117
Name :
85vette will become famous soon enough
Default

Hey Rich, contact L.B. Brooks (owner of Brooks Concrete in Panacea) at 984-5279 and tell him what you're building. I'm sure he can tell you who's capable of doing the work. He's been in business down here for many years.
__________________
I Have Noticed That A Lot Of People Demanding Free Stuff Are Not Wearing Work Boots.
85vette is offline   Reply With Quote
Unread 09-02-2009, 10:23 PM   #17
Rich Z
Internet Sanitation Engineer
 
Rich Z's Avatar
 
Join Date: Mar 2006
Location: Crawfordville, FL
Posts: 15,127
Name : Rich Zuchowski
Rich Z will become famous soon enoughRich Z will become famous soon enough
Default

Quote:
Originally Posted by 85vette View Post
Hey Rich, contact L.B. Brooks (owner of Brooks Concrete in Panacea) at 984-5279 and tell him what you're building. I'm sure he can tell you who's capable of doing the work. He's been in business down here for many years.
Thanks, I'll do that.

Darrell at SteelMaxBuildings says they can delay shipment of the building if necessary, but with the original delivery date of October 7th and the St. Augustine get together on the week of October 19th, it's going to be dicey, for sure. Plus Chris is thinking the first part of October will be when my new drivetrain is ready for the transplant into the C5Z.

Did I mention that I am going to be selling off all my animals from my business around this time as well?

October is shaping up to be more fun than a barrel full of monkeys.
__________________
Rich Z is offline   Reply With Quote
Unread 09-06-2009, 05:05 PM   #18
Rich Z
Internet Sanitation Engineer
 
Rich Z's Avatar
 
Join Date: Mar 2006
Location: Crawfordville, FL
Posts: 15,127
Name : Rich Zuchowski
Rich Z will become famous soon enoughRich Z will become famous soon enough
Default

Well this certainly is being a learning experience!

I feel like I've been chasing my tail for the past several days. Trying to get a concrete guy and someone to erect the building is wearing me down. Got some people I've talked to about the concrete, but nothing firmed up yet. Don't have ANYONE lined up for the building erection.

I got to feeling kind of desperate, so I contacted a general contractor who stopped by here to look at the plans and discuss taking this over from here. Well, he looked over the plans, and he wasn't too subtle about looking over the two corvettes under the carport and the house. So I could feel it coming. He wanted $7,500 to do the permit and manage the process. That, of course, was outside of the prices for the segments needing to be done (concrete, erection, electrical). A second option was for him to just pull the permit, and be available for consultation purposes for $5,000. I told him I felt that was quite high for what he would actually be giving me in return. So much for that option, and back to square one.

One of the concrete guys called me this morning. He's quoting something like $11.7K for the slab and apron. He mentioned that there was some sort of requirement for the area to be treated for termites. Yeah, right. For a completely metal building on a concrete slab. That got me to steaming a little bit. He also mentioned that a friend of his (the one with the actual license) mentioned that if my land is zoned as agricultural, I wouldn't even need a permit. Well, just so happens it is... So I need to look into this further...

It's been rather frustrating, to say the least. The permit office people want to require you to use someone licensed to do the work, but with the economy losing work for so many people, a LOT of those licensed workers let their licenses lapse because the work wasn't there, and they couldn't afford the licensing fees any longer. Now I'm not sure what is required in order to renew such a license, but it's entirely possible that this requirement for licensing may very well help KEEP such tradesmen out of work once they run out of work. Talk about unintended consequences.....

Not sure how this is all going to work out, but certainly is NOT what I had been expecting to go through for something so simple....
__________________
Rich Z is offline   Reply With Quote
Unread 09-06-2009, 08:25 PM   #19
gsdave
engineer
 
gsdave's Avatar
 
Join Date: May 2008
Location: Marianna
Posts: 228
Name :
gsdave is on a distinguished road
Default

I believe the termite requirement applies to any permited structure. The county made us do that for our slab for the future barn at our place.

Our county requires a permit for any building except a 'farm building'. If you're parking a car under it, they don't view it as a farm building here. I'm sure your county is similar.

On the licenses....Its not that expensive to maintain your license to do work. If someone is telling you that as an excuse, I'd recommend looking elsewhere. Also the individual workers are not licensed, but the company (or sole proprietor) is.
gsdave is offline   Reply With Quote
Unread 09-07-2009, 04:49 PM   #20
Rich Z
Internet Sanitation Engineer
 
Rich Z's Avatar
 
Join Date: Mar 2006
Location: Crawfordville, FL
Posts: 15,127
Name : Rich Zuchowski
Rich Z will become famous soon enoughRich Z will become famous soon enough
Default

I've reviewed the statute and there is nothing in there that demands nor implies that the building MUST be for exclusive farm use. It has to be on a farm (this land has been classified as being a tree farm since before we bought it back in 1987 and we have applied for that exemption every year we have owned this property), and cannot be for even part time residential use (meaning no one can actually live or stay within the building as a resident).

The Advisory Legal Opinion AGO 2001-71 (http://myfloridalegal.com/ago.nsf/Op...256AE1006783B7) goes even further to specifically state:

Quote:
"For purposes of this section "nonresident farm building" means any building or structure located on a farm that is not used as a residential dwelling. Farm is as defined in s. 823.14."
I fully comply with those statutory requirements and definitions.
__________________
Rich Z is offline   Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Custom Garage Makeover - Corvette Cribs RSS Feed Tech and How-To Articles 0 06-16-2009 06:52 PM
Timber Wolf Speed Shop C2 Build - The Timber Wolf C2 Finale RSS Feed Tech and How-To Articles 0 05-06-2009 10:00 PM
Thinking about a garage.... Rich Z General Corvette Discussions 24 03-12-2009 01:17 AM
Corvette Garage in Florida - Garages For Collector Corvettes RSS Feed Tech and How-To Articles 0 09-18-2008 07:01 PM
Car Cleaning Products - Garage Talk RSS Feed Tech and How-To Articles 0 08-20-2008 08:00 PM


All times are GMT -4. The time now is 03:03 AM.


Powered by vBulletin® Version
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Page generated in 0.11635303 seconds with 12 queries
All material copyrighted by CorvetteFlorida.com and
the respective owners of the material posted.